Project Overview
Successfully
executed the civil construction works for temporary facilities at Rumaila Camp,
including site surveying and setting out, earthworks, excavation, reinforced
concrete foundations, concrete slabs and walkways, installation of
prefabricated buildings and temporary structures, internal roads, paving works,
perimeter fencing, drainage systems, underground utility trenches, water and
sewer networks, electrical duct banks, backfilling and compaction, and all
associated infrastructure works.
The project was completed in accordance with
approved drawings, project specifications, international construction
standards, and HSE requirements, ensuring safe, efficient, and high-quality
project delivery.